INSTALLATION

Installation service of Tri Viet Steel Building with criteria “Quality – Safety – Aesthetics” , standard project management system, experienced engineers and well-trained workers. We manage throughout the production and installation processes, from the inspection of input materials to construction and installation at the construction site to ensure that customers receive the best products. After the project is handed over, our warranty team will provide professional warranty and maintenance services to keep the project well cared for and more sustainable over time.

Installation is the final stage of the product chain. Strictly follow the construction process and methods carefully prepared to ensure safety during construction, ensure product quality, aesthetics in every detail and progress is always under control.

Safety, quality and punctuality are the result of the synchronization and rhythm of the whole system.

The close coordination between the departments in the office and the factory should make our work on schedule.

The construction supervisor is responsible for updating and reporting regularly to the main person in charge to handle the current status at the construction site

OMRON HEALTH EQUIPMENT FACTORY

– Total area: 2,000 m²

– Steel weight: 100 tons

– Location: Vietnam Singapore Industrial Park II, Binh Duong Province

Omron Healthcare Manufacturing Vietnam Co., Ltd., a member of OMRON Corporation of Japan, was established on March 19, 2007, is an enterprise specializing in the supply and assembly of medical equipment (machines made by OMRON brand automatic blood pressure, nebulizer machine…). Over 12 years of establishment and development, the company has made certain achievements in the domestic and foreign medical device market segment.

TYPICAL PROJECTS

See all
pre-engineered-triviet-steel-shimmer-factory-thumbnail

SHIMMER FACTORY

  • Area: 11,500 m²
  • Workload: 830 tons
  • Location: Cau Tram IP, Long An Province, Vietnam
pre engineered building-triviet pre engineered building-triviet steel-adidas shoes factory-thumbnail

ADIDAS SHOES FACTORY

  • Area: 28,000 m²
  • Workload: 2,300 tons
  • Location: Suoi Tre IP, Dong Nai Province, Vietnam
kho tan van 1

TAN VAN WAREHOUSE

  • Area: 36,000 m²
  • Volume: 1,300 tons
  • Location: City Bien Hoa, Dong Nai Province, Vietnam
steel structure-triviet steel-an thien pharmaceutical-01

AN THIEN PHARMACEUTICAL FACTORY

  • Area: 11,600 m²
  • Workload: 800 tons
  • Location: Hiep Phuoc IP, Nha Be District , HCMC

OMRON HEALTHCARE MANUFACTURE FACTORY

  • Area: 2,000m2
  • Volume: 100 tons
  • Location: VSIP 2 Industrial Park, Binh Duong Province
steel structure-triviet steel-mapletree logistics warehouse-thumbnail

MAPLETREE VIETNAM LOGICTICS WAREHOUSE

  • Area: 115,000 m2
  • Location: VSIP 2 Industrial Park, Binh Duong Province
pre-engineered-buildings-triviet-steel-texray-vietnam-garment-factory-thumbnail

TEXRAY VIETNAM GARMENT FACTORY

  • Area: 12,700 m²
  • Volume: 400 tons
  • Loi Binh Nhon Industrial Park, Long An Province
steel-structure-triviet-steel-kim-duc-fabric-bag-factory-thumbnail

KIM DUC FABIC BAG FACTORY

Area:50,000 m²
Volume: 1,400 tons
Location: Vinh Loc 2 Industrial Park, Long An Province

Pre-engineered-buildings-triviet-steel-jiahsin-factory-thumbnail

JIA HSIN FACTORY

  • Area: 29,000 m2
  • Volume: 1,800 tons
  • Location: Cau Tram Industrial Park, Long An Province
steel-structure-triviet-steel-sai-gon-3-jean-factory-thumbnail

SAI GON 3 JEAN FACTORY

  • Area: 50,000 m²
  • Volume: 700 tons
  • Location: Vinatex Industrial Park, Dong Nai Province
steel-structure-building-bw-my-phuoc-4-thumbnail

BW INDUSTRIAL THOI HOA

  • Area: 30,000 m2
  • Workload : 600 tons
  • Location: Thoi Hoa IP, Thoi Hoa Ward, Ben Cat Town, Binh Duong Province

LONGYI FACTORY

  • Area: 24,000 m2
  • Volume: 800 tons
  • Location: My Phuoc 2 Industrial Park, Binh Duong Province
steel structure-triviet steel-buon ma thuot airport-thumbnail

BUON MA THUOT AIRPORT

  • Area: 27,000m2
  • Volume: 600 tons
  • Location: Buon Ma Thuot City, Daklak Province
pre engineered buildings-nha-may-san-xuat-nhua-lock&lock-thumbnail

LOCK&LOCK PLASTIC MANUFACTURING FACTORY

  • Area: 16,000 m2
  • Volume: 700 tons
  • Location: Tan Thanh District, Ba Ria - Vung Tau Province
steel structure-nha-may-bac-hoang

BAC HOANG FACTORY

  • Area: 24,000 m2
  • Weight: 1,400 tons
  • Location: Ho Nai Industrial Park, Dong Nai Province
steel structure-triviet steel-kuo yuen-02

TAY NINH KUO YUEN BATING FACTORY

  • Area: 13,500 m²
  • Workload: 1,300 tons
  • Location: Thanh Thanh Cong IP, Trang Bang District, Tay Ninh Province
steel-strusteel-structure-building-triviet-steel-dai dong tien plastic factory-thumbnail

DAI DONG TIEN PLASTIC FACTORY

  • Area: 10,000 m²
  • Workload: 210 tons
  • Location: Nhon Trach IP, Dong Nai Province
pre-engineered buildings-yuen-foong-yu-paper-enterprise-thumbnail

YUEN FOONG YU PAPER ENTERPRISE BINH DUONG

  • Area: 35,000 m2
  • Volume: 2,000 tons
  • Location: VSIP 2 Industrial Park, Binh Duong Province
nha-thep-tien-che-triviet-steel-trung-tam-thuong-mai-pandora-truong-chinh-

PANDORA TRUONG CHINH TRADE CENTER

  • Area: 30,000 m²
  • Workload: 530 tons
  • Location: Tan Binh District, Ho Chi Minh City
steel-structure-vinh-hung-fsteel-structure-vinh-hung-aluminum-factory-thumbnail

VINH HUNG ALUMINUM FACTORY

  • Area: 55,000 m2
  • Volume: 1,600 tons
  • Location: Long Giang Industrial Park, Tien Giang Province
pre-engineered-buildings-dae-muyng-plactic-factory--thumbnail

DAE MYUNG PLASTIC FACTORY

  • Area: 7,600 m2
  • Volume: 380 tons
  • Location: Long Thanh Industrial Park, Dong Nai Province

steel-structure-building-nha-may-san-xuat-van-mdf-fsc-thumbnail

MDF -FSC FACTORY

  • Area: 25,000 m²
  • Workload: 1,200 tons
  • Location: Nam Dong Phu IP, Binh Phuoc Province

NUMBER ONE BEVERAGE FACTORY HAU GIANG

  • Area: 40,000 m²
  • Workload: 900 tons
  • Location: Song Hau IP, Hau Giang Province
steel structure-triviet steel-vietjetair-thumbnail

AVIATION ACADEMY VIETJET AIR

  • Area: 15,000 m²
  • Workload: 650 tons
  • Location: Saigon Hi-tech Park, District 9, Ho Chi Minh City
steel structure-triviet steel-handbag factory-thumbnail

HANDBAG FACTORY

  • Area: 8,400 m²
  • Weight: 300 tons
  • Location: South Dagon Township, Yangon, Myanmar
nha thep tien che-triviet steel-nha may che bien thuc pham tho phat-thumbnail

BAOZI THO PHAT FACTORY

  • Area: 23.000 m2
  • Workload: 150 tons
  • Location: Hiep Phuoc IP, Nha Be District, HCMC

steel structure-triviet steel-hoang duc pharmaceutical factory-thumbnail

HOANG DUC PHARMACEUTICAL FACTORY

  • Weight: 230 tons
  • Location: Long Hau Industrial Park, Long An Province
pre-engineered buildings-great-kingdom-thumbnail

GREAT KINGDOM FURNITURE FACTORY

  • Are: 63.300 m2
  • Workload: 1.500 tấn
  • Location: Giang Dien IP, Dong Nai Province
pre-engineered-buildings-rehab-italian-design-factory-thumbnail.jpg

REHAB ITALIAN DESIGN FACTORY

  • Area: 20,000 m2
  • Volume: 1,000 tons
  • Location: Nam Tan Uyen Industrial Park, Binh Duong Province
pre engineered buildings-triviet steel-super foam viet nam-thumbnail

WORKSHOP OF SUPER FOAM VIET NAM

  • Area: 23,500 m2
  • Volume: 950 tons
  • Location: Phu Chanh Industrial Park, Binh Duong Province
steel-structure-building-triviet-steel-nha-kho-bw-industrial-tan phu trung

BW TAN PHU TRUNG

  • Area: 64,000 m2
  • Workload: 800 tons
  • Location: Tan Phu Trung IP, Cu Chi District, Ho Chi Minh City
steel sructure-triviet steel-ptsc factory-thumbnail

PTSC FACTORY

  • Workload: 1,300 tons
  • Location: Ba Ria - Vung Tau Province
steel structure-triviet steel-dai nam race course-thumbnail

DAI NAM RACE COURSE

  • Area: 10,000 m²
  • Workload: 1,500 tons
  • Location: Dai Nam Culture Park, Binh Duong Province
ket cau thep-triviet steel- nha may san xuat thuc an gia suc cj mekong-thumbnail

CJ MEKONG FODDER PRODUCTION FACTORY

  • Area: 19,000 m2
  • Weight: 500 tons
  • Location: Binh Minh Industrial Park, Vinh Long Province
ket cau thep-triviet steel-vincom thu duc-thumbnail

VINCOM TRADE CENTER THU DUC

  • Area: 27,860 m²
  • Workload: 400 tons
  • Location: Thu Duc District, Ho Chi Minh City
steel structure-trivietsteel-xing guang-thumbnail

XING GUANG FACTORY

  • Area: 28.000 m2
  • Workload: 2.640 tons
  • Location: Thanh Thanh Cong IP, Tay Ninh Province
pre-engineered buildings-triviet steel-hansae garment factory-thumbnail

HANSAE GARMENT FACTORY

  • Area: 20,000 m²
  • Volume: 1,000 tons
  • Location: Thilawa SEZ (Zone B), Yangon, Myanmar
phu my 2 warehouse

PHU MY 2 WAREHOUSE

  • Area: 29,700 m2
  • Volume: 870 tons
  • Location: Phu My 2 Industrial Park, Ba Province Ria - Vung Tau
nhà thép tiền chế-triviet steel-nhà máy sản xuất thức ăn gia súc haid feed-thumbnail

HAID FEED FACTORY

  • Area: 20,000 m2
  • Volume: 1,200 tons
  • Location: Dau Giay Industrial Park, Dong Nai Province
steel structure-triviet steel-ang son 2 cement factory-thumbnai

ANG SON 2 CEMENT FACTORY

  • Workload: 2,100 tons
  • Location: Quang Ninh, Quang Binh Province

 

steel structure-rochdale spear funiture factory--thumbnail

ROCHDALE SPEAR FURNITURE FACTORY

  • Area: 86,000 m2
  • Volume: 2,000 tons
  • Location: Tan Uyen Town, Binh Duong Province
pre-engineered-buildings-king-jim-factory-thumbnail

KING JIM FACTORY

  • Area: 18,000 m2
  • Location: My Phuoc 3 Industrial Park, Binh Duong Province
ket cau thep-triviet steel-showroom kia hoang minh giam-thumbnail

SHOWROOM KIA – MAZDA HOANG MINH GIAM

  • Area: 9,500 m²
  • Workload: 900 tons
  • Location: Phu Nhuan District, Ho Chi Minh City

 

steel structure-triviet steel-green feed-thumbnail

GREEN FEED FACTORY

  • Area: 23,000 m2
  • Weight: 1,100 tons
  • Location: Binh Minh Industrial Park, Vinh Long Province
steel-structure-building-triviet-steel-cach-nhiet-cat-tuong-thumbnail

CAT TUONG INSULATION MATERIAL FACTORY

  • Area:
  • Workload:
  • Location:
ket cau thep-triviet steel-nha may dan on-thumbnail

DAN ON FACTORY

  • Area: 11,500 m²
  • Workload: 400 tons
  • Location: My Phuoc IP, Binh Duong Province
steel structure-mercedes-benz-powder coating factory-thumbnail

MERCEDES-BENZ POWDER COATING FACTORY

  • Area: 30,000 m2
  • Volume 500 tons
  • Location: Go Vap District, Ho Chi Minh City
ket cau thep-triviet steel-nha may ca phe loc tien-thumbnail

LOC TIEN COFFEE FACTORY

  • Area: 50,000 m²
  • Weight: 700 tons
  • Location: VSIP 2 IP, Binh Duong Province

 

steel structure-nha may san xuat bot giat net

NET WASHING POWDER FACTORY

  • Area: 36,000 m2
  • Volume: 1,000 tons
  • Location: Loc An Industrial Park, Dong Nai Province
ket cau thep-triviet steel-nha may number one chu lai-thumbnail

NUMBER ONE CHU LAI BEVERAGE FACTORY

  • Area: 42,000 m²
  • Volume: 1,200 tons
  • Location: Hau Can Cang Tam Hiep IP, Quang Nam Province
steel-structure-first-solar-thumbnail

FIRST SOLAR FACTORY

  • Area: 116,000 m2
  • Volume: 4,000 tons
  • Location: Cu Chi District, Ho Chi Minh City

READY-BUILT FACTORY (RBF)

The "Ready-Built Factory (RBF) Development" project was recently launched by Viteccons company and Tri Viet Steel Buildings Company will be involved in the supplying & installing of steel structures for two factories: factory 8 and factory 9 in the project with a total steel volume of up to 350 tons. The Ready-Built Factory (RBF) Development Project is an advanced solution in the field of industrial construction.

The project is surrounded by a key transportation infrastructure system with 3 ports, 2 highways and the future Long Thanh International Airport in the southern key economic region. This is a promising and promising project, bringing many development opportunities for the construction industry in the region.

Project Information:

  • Total area of factory 8 and factory 9: 13,600 square meters
  • Total steel volume: 350 tons
  • Investor: KTG Industrial managed by Boustead & KTG Industrial Management Co., Ltd.
  • Main Contractor: Viteccons
  • Steel supply & installation contractor: Tri Viet Steel Buildings
  • Location: Road No. 3, Nhon Trach II - Nhon Phu Industrial Park, Phu Hoi Commune and Hiep Phuoc Town, Nhon Trach District, Dong Nai Province

RICHBASE FACTORY

The RICHBASE factory project stands out as a prime example of the capability to provide a "Comprehensive pre-engineered steel solution" with a full service: Design Manufacture & SupplyInstallation of steel structures by Tri Viet Steel Buildings. Currently, the project is in the phase of installing the steel frame and gearing up for the next stage in the coming period.

Project Information:

  • Total Project Area: 9.205m²
  • Total Steel Quantity: 32.068.8 kg
  • Investor: RICHBASE (VIETNAM) CO., LTD
  • Main Contractor: Architects & Construction Service Corporation
  • Steel Structure Contractor: Tri Viet Steel Buildings
  • Address: D.10 Street, Chau Duc Industrial Zone, Trung Nghia Hamlet, Nghia Thanh Commune, Chau Duc District, Ba Ria - Vung Tau Province.

LOGISTIC LOGOS LONG AN

The Logistic Logos Long An Project is situated at Plot 3D-8, Street 12, Long Hau 3 Industrial Zone, Long Hau Commune, Can Giuoc District, Long An Province. This location is strategically positioned to the south of downtown Ho Chi Minh City.

Benefiting from its advantageous location, the project is only a 25-minute drive to District 7 and 40 minutes to District 1, facilitating easy connectivity to key economic areas across the country.

Furthermore, the surrounding area of the project is experiencing robust economic growth. Long Hau 3 Industrial Zone stands out as one of the most developed industrial zones in Long An Province, boasting expansive land and modern infrastructure. This area attracts numerous businesses for investment and manufacturing activities, generating a substantial demand for logistics services.

With its location advantages and development potential, the Logistic Logos Long An Project is poised to become a modern logistics hub, contributing significantly to the socio-economic development of Long An Province and the southern region.

Project Information:

  • Total project area68.819 m²
  • Total steel volume: 1,100 Tons
  • Investor: Logos Vietnam Long An 1 Co., Ltd
  • Implementing unit: Tri Viet Steel Buildings Company
  • Location: Long Hau Commune, Can Giuoc District, Long An Province.

TAM HUNG PIG FARM

The Tam Hung High-Tech Pig Farm Project is a key project of Tay Ninh province, aimed at developing the province's livestock industry. The entire project is being implemented by Tri Viet Steel. The project is currently in the roofing phase. Once completed, the project will contribute to improving the productivity, quality, and efficiency of pig production in Tay Ninh province.

Project Information:

  • Total project area: 20,819 m²
  • Total steel volume: 445,869 Kg
  • Investor: Tam Hung Trading and Service Company Limited
  • Implementing unit: Tri Viet Steel
  • Location: Tan Ha commune, Tan Chau district, Tay Ninh province

HAI DANG PIG FARM

The Hai Dang Pig Farm Project is an advanced pig farming initiative that is currently attracting attention from numerous investors and agriculture enthusiasts. With the goal of establishing a modern pig farming model, it aims to ensure optimal stocking density, biosecurity, and environmental protection.

Project Infomation:

  • Total project area: 20.819 m²
  • Estimated total steel: 445.869 Kg
  • Investor: Tam Hung Trading and Service Co., Ltd
  • Implementing unit: Tri Viet Steel Buildings Company
  • Location: Suoi Ngo Commune, Tan Chau District, Tay Ninh Province

FLEMING FACTORY 03

The FLEMING FACTORY 03 project is a prime example of TriViet Steel capability to provide comprehensive pre-engineered steel solutions through a turnkey service, including design, manufacturing & supply, and steel structure installation. The project is currently in the process of being expedited to completion.

Project Information:

  • Investor: Fleming International Vietnam Ltd
  • Main Contractor: Solutions Construction Co., Ltd.
  • Steel Structure Contractor: TriViet Steel Buildings Co., Ltd
  • Location: Lot 506, Road 13, Amata Industrial Park, Long Binh Ward, Bien Hoa City, Dong Nai Province, Vietnam