Triviet Steel - Erection Steel Frame Of Factory

01/08/2018

Today, steel frame structure or also known as pre-engineered steel buildings are increasingly applied in industrial construction projects, buildings ... by the advantages compared with other types of construction.

Contact us: (+84) 98 284 98 99 - (028) 6298 5703

 

The process of Erection Steel Frame Of Factory

 

In order to have a complete steel structure, the pre-engineered steel building installation process is considered as the last step to complete the steel structure products in accordance with customer requirements and standards.

 

 

Stages of construction - Tri Viet Steel

 

1. Receiving, storage and handling of construction materials:

We receive and control construction materials to ensure the right quality and quantity are available. 

Material management plays a vital role in construction quality. Therefore, we assure no deformations, no scratches to control construction quality.

 

 

2. Installation of foundation bolts:

 

3. Erection of primary structure:

Erection of primary members need to be in a synchronized manner complying with erection plan to ensure a 100% of correct angles and heights.

Machineries & equipment as: truck cranes, forklifts, digital theodolite and safety equipment are furnished for workers at job site. 

 

4. Installation of roof panels:

The installtion of the roof panel begins after completion of primary structure including anchor bolts and bracing systems.

We set up the roof carefully for installation to ensure quality and aesthetic appeal of the building.

 

 

5. Installation of wall panels:

6. Completion of construction:

The final stage is checking in detail the finished phases for acceptance.

 

 

References: Triviet Steel projects have been implemented

References: Production process of steel assembly

 

- - - - - - - - - - - - - - - - - - 

TRIVIET STEEL BUILDINGS CO.,LTD

Vietnam head office

Address: 3rd Floor, Carina Plaza, No. 1648 Vo Van Kiet Street, Ward 16, District 8, HCM City, Vietnam
Email: info@trivietsteel.com 
Tel:‎ (+84) 98 284 98 99

Myanmar head office

Address: No. H39, 3rd Main Road, Thiri Yadanar Wholesales Complex Market, North Okkalapa Township, Yangon, Myanmar.
Email: info@trivietsteel.com 
Tel:‎ (+84) 98 284 98 99

List of representative offices


Chat now: m.me/TrivietSteelBuildings

Youtube: goo.gl/46SSKe

Website: www.trivietsteel.com

 

© 2017 Tri VietSteel. All Rights Reserved.
Designed by